Skip to Content

Globomass Anaerobic Digestion Plant, Serbia

Water Utilities
Globomass Anaerobic Digestion Plant

The Project consisted of three individuals two-megawatt modular biomass-to-power plans. The feedstock for the plant was based on a combination of Corn Silage, Manure, Wheat Straw, Sorghum and Molasses to produce the 11,507,411 m³ of Methane required to operate the plant.

Papel de Infrata

We acted as Lender Technical Advisor to provide a review and assessment of the technical issues in connection with the construction, development and operations of a 6 MW Anaerobic Digestions (“AD”) renewable power plant in Vrsac, Serbia