Skip to Content

Liefkenshoek Railway Line, Belgium,

Railways
Shutterstock 527777977 Crop 1

This 42-year concession involves the DBFM of a two-lane 16.2km rail link and underwater tunnel in the Port of Antwerp. Numerous waterways are located in close proximity to the project site, and must be cautiously negotiated. This project is expected to reduce travel distances by 22km.

Infrata's role:

Infrata undertook technical due diligence on this €841 million project in 2008. 

Investment strategies that run right on time.

See Railways