The project will expand I-35W from U.S. Highway 287 about eight miles north to Eagle Parkway. This highway expansion offers a connection between the downtown business district in downtown Fort Worth to the rapidly growing areas to the north.
This project is the following part of the North Tarrant Express Toll Road after segments 3A and 3B. Segment 3C is being built as a change order to the facility agreement entered into between Texas Department of Transportation (TxDOT) and the consortium in 2013 for the segment 3A and 3B.
Following part of the North Tarrant Express Toll Road after segments 3A and 3B. Segment 3C is being built as a change order to the facility agreement entered into between Texas Department of Transportation (TxDOT) and the consortium in 2013 for the segment 3A and 3B.