This transaction involved the acquisition of the Circuito 3 (Ruta 14), a 292km key road corridor in Uruguay. The road connects with the Argentinian border and is strategically...
The Project involves the design, construction, finance, operation and maintenance of the 1,960-inmate prison for a 25-year duration period. The operation and maintenance activities...