The Consortium is to design, build, finance, operate and maintain the A 94 from Forstinning to Marktl for a period of 30 years (including the design and construction phase). The Project includes the design and construction (over period of 3.5 to 4 years) of (i) Bi-directional 4-lane motorway from Pastetten to Heldenstein (PA 02 + PA 03); (ii) 57 bridges of varying spans (between 20 to in excess of 100metres); and (iii) 22,000sqm of noise protection walls.
Infrata's Role
We acted as Lenders Technical Advisor for this project.